Monday, 27 July 2015

Aerial Photo Order 3 (Otago Central Railway) - Cromwell to Alexandra

I am currently setting up an order for 21 more aerial photos as follows:
  • Survey 1452 of 1962
  • Run S. Photo 7 - this should give me the very end of the line at Cromwell which so far has eluded me.

    Run W, Photos 19-20 and  Run X, Photos 1-2: Alexandra


  • Survey 5073 of 1977
    • Run D, Photo 15; Run G, Photo 7; Run H, Photo 15 cover the 1907 Clyde station and just to its south and should therefore show the NZED siding that was in use until 1978.
  • Survey 5880 of 1981
    • Run A, Photo 1 should show the new Clyde station yard just opened (hopefully - this is a single photo in this series as no others exist in the lists). It would be interesting to speculate if this was a special one taken by NZR to base an aerial map of the Clyde yard, as they did use aerial photographs to make diagrams for staff use.
  • Survey 11936 of 1992. This is a big survey that must have been taken quite soon before the first filling of the Clyde Dam started. I am using this series to get a look at selected stations along the route rather than the whole route.
  • Run L, Photo 2; Run M, Photo 3; Run I, Photo 1/3; Run Q, Photo 2/3; Run R. Photo 2/3; Run U, Photo 1/2; Run V, Photo 4.
  •  Survey 5361 of 1979. This is to be scanned at high resolution because it is 1:25000 instead of the considerably larger scales of the other prints. Because of this it will end up being at a cost of $30 for the single image. I can't afford to have too many high res scans along the way because of the cost (I also have to pay the $50 base fee so I may as well get my money's worth and put in another 20 images at 600 dpi which can be included in the $50).
So that is 21 images for $80 - just under $4. And we are finally moving down to Alexandra. As I expect 4 images should give enough detail of Alexandra yard and from here we will go fairly quickly down the line to Wingatui. I am estimating another 6 batches of photos will be needed to finish all the remaining yards down to Middlemarch. It is possible I could continue looking at aerials for the Taieri Gorge section as well as there are many stations which have disappeared since that time.

So there is some scope to look again at the publication timeline. I also intend to obtain the chainage chart for the line and I don't know how many pages it is. Hopefully 20 pages will cover the Cromwell Gorge because the bridges and features in that section are not documented elsewhere whereas all the bridges and other things on the Rail Trail section have been documented by DOC in their Conservation and Scientific Notes publications. Once all of that is put together the publication date ends up getting pushed out a bit. The earliest as far as I can see will be the middle of next year.

Once Volume 17 is finished the aim will be to push ahead with first editions of every other volume (2nds of North Auckland and Napier-Gisborne) and this might go on concurrently with the Volume 17 work if I end up waiting for further photo orders to come in. There won't be any other volume as detailed as Volume 17 in the near future, All those other volumes will have to wait for 2nd (or 3rd in the case of NA/NGL) editions to get any aerial sourced data into them (except for the Christchurch area and a few other cases where free aerial footage has been used).

Sunday, 26 July 2015

NZ Rail Maps: Otago Central Railway

Well this blog has now been launched as being separate from NZ Rail Maps and I have copied across all of the content from Enzed Transport that is maps related. The final layout of this blog and various other settings have yet to be completed and may well change over the next few days.

What is now relevant is that this blog will be the public face of the project. The actual development work is carried out in a private Facebook group with restricted membership. Since the posts in that group are not visible to non-members, the blog will be published and will also send a post feed to the Enzed Transport & NZ Rail Maps Facebook page.

As some previous posts have described, the Otago Central Railway is the current focus of the Maps project, specifically in relation to Volume 17, 2nd edition which is being put together. The first part of the route to be looked at has been the Cromwell Gorge. By using old aerial photography the route of the former railway has been traced in relation to present day features such as Lake Dunstan and the current highway. This includes the sites of the Cromwell, Waenga and Doigs stations.

The main focus of this has now reached Clyde and at present a request for further aerial photographs from Archives New Zealand is being put together to get some pictures of the Clyde and Alexandra areas. And so it will continue down the line towards Wingatui. Archives New Zealand recently doubled their charges, so that for 20 images it now costs $50 instead of $25. This means I will be limiting my purchases to 20 per month or $50 in general, except where extra scans are needed, but that will not really be an issue because it's hard work to get through them very quickly anyway. Bearing in mind that it can take Archives up to two weeks to process a request then one batch per month seems entirely reasonable. I actually received the last batch about three weeks ago so it does seem reasonable to assume that one batch a month is in keeping with my productive output during term time, rather than the school holidays.

Thursday, 21 May 2015

Otago Central Railway: Wedderburn Highway Realignment

Although the Otago Central Railway had few changes in alignment, roads around it were realigned many times. One of the more interesting changes is just north of Wedderburn where the map dated from 1939 confirms that the highway was then located directly south of the railway rather than north today. As part of the highway the overbridge with railway number 66a was constructed and still exists on the route today although now bypassed. The highway realignment eliminated this bridge and a level crossing, the level crossing was very close to the railway summit of 630 metres which is the highest point on the whole of the Otago Central Railway.
WedderburnN-1939
The Wedderburn map (an extract from an NZGS map of 1939). http://natlib.govt.nz/records/21237571 The section of highway realigned is in the upper section of the map where the highway crosses the railway next to the words “F.McCarthy” and then crosses again further up near “P.Darling”. But whether the latter (northernmost) crossing was on an overbridge at the time the map was drawn has yet to be determined as the alignment shown actually resembles the current alignment with a level crossing due west of where the bridge actually is.
WedderburnN-RM
My map showing the entire section and the old and current highway routes. Bridge No.66a clearly is shown, along with the present alignment of the road to miss the overbridge entirely. Since the bridge number indicates it was not original, it is possible that where the road goes today, due west over the overbridge, may also be the original route that the road followed, or close to it, at a level crossing. Central Otago District Council's bridge inventory lists the bridge as "[bridge no.] 108 [ward] MANIOTOTO [roadway] OLD SH DOWN FROM COAL PIT ROAD [waterway] RAILWAY" implying this may still be a public road. An interesting point is the extra land set aside at the summit which suggests provision may have been made for a summit siding.

WedderburnN-Br66The GE shot depicting Bridge No.66a which still exists today. The Department of Conservation’s CASN 137 document describes it as follows: “Bridge 66, the road overbridge for State Highway 85 north of Wedderburn, is a 1966 pre-stressed concrete bridge. The abutments of the 1900 bridge are still visible, but are plain concrete foundations which probably held wooden piles. It does not require any special historic consideration. The highest point of the line (2029 feet, 612 m) is just north of this bridge. Bridge 66a, a private concrete overbridge, is very similar to Bridge 66.” So most of the description is actually the similar 1966 bridge further south. But the comment clearly implies Bridge 66a is now in private ownership, and further to that, Bridge 66a was almost certainly built first because this section of the highway probably is much earlier than 1966 and because there was already an overbridge at Bridge 66 dating from the original line construction. How much earlier Bridge 66a may have been installed is unclear because maps between 1939 and 1970 (by which stage the highway had been realigned) are hard to find. But my guess is the S bend in the highway needed for the bridge does imply it was installed well before 1966. However the number assigned to it (66a) strongly suggests it was added sometime after the line opened, certainly after the original bridge numbering sequence was assigned to the line. If that were the case then a level crossing at this location must have preceded the bridge, and this level crossing may well be at the location of where the road currently crosses the rail trail, shown above as a black line. There are earlier Naseby Survey District maps of this location but they are ambiguous in this area. But my guess is that they show both crossings via the cadastral map land boundaries and therefore leave unanswered the question of when the bridge was actually installed. The map revision dated 1954 still shows the highway in the old position.
UPDATE: I received information today including photos of the bridge and the information is that it appears to have been installed in 1950. Clearly at this time the realignment of the highway was still some years away. Whether this part of the highway was ever sealed is another question naturally, as it is not in a sealed condition today. The deck of the bridge as it now stands does not show any sealing. The way the bridge was installed is not commensurate with the needs of a high speed highway, as with the sharp bends it has been done in the cheapest possible way to make the shortest bridge, but as the line where the bridge goes over is in a cutting, the cutting may have caused visibility problems for traffic approaching the crossing. It does appear that the bridge is in private ownership along with the road today. Also it seems more likely the black line route marked would be where the railway went prior to the bridge, as this is clearly marked out in survey boundaries and on private land it would be unlikely to be formally surveyed. The location of the crossing would have been chosen to improve visibility being well clear of the cutting which can be seen on the above map and at right angles to get the best view overall. The use of the different areas of road isn’t so clear as of today but there may be still some use of the bridge but as we can see the old level crossing route is very clear and indicates it likely is still being used also.