Monday, 18 December 2017

Waiau Branch [1G]: Waipara 1979

At the north end there have been some changes in track layout between the branch, branch platform sidings, main and loop. At the south end the main difference is the country works depot being built, the engine depot facilities have completely disappeared and the singleman's quarters ("the kennels") have gone.