Wairarapa Line [0FF]: Volume 6 Progress Update 32

Good afternoon. We are pleased to report that all mosaics needed to complete Volume 6 have now been created, and are being exported into tiles for Qgis today. This will enable us to resume a much speeded up rate of completion for the maps to be pushed forward with station and other layouts drawn from Cross Creek to Ngawapurua, encompassing a total distance of around 130 km of track. This in total is around three quarters of the total length of the corridor. So far, work on this volume has taken approximately 10 weeks to complete and we hope one more week or slightly more will see the volume completed. We are extremely keen to see this happen and will be pulling out the stops to ensure it does not take any longer than necessary to accomplish.

We are also working on a submission for Christchurch Transport Blog regarding the Green Party's proposal for commuter rail development especially as encompasses Christchurch. This will naturally take time away from the NZ Rail Maps project. However we will be ensuring that this time detraction is minimal in the rest of the time needed to complete Volume 6 so that that task is not impeded in any way.

Our latest station layout to be completed is Masterton (see below). Although this is out of sequence, we are pushing ahead with Cross Creek today and will bring forth the remaining layouts over the coming days as we push out the maps sequentially. Cross Creek will have to be a mixture of tracing and using a schematic layout for reference as we do not have an exact plan of the yard and the aerial photo taken in 1943 is not sharp enough to be completely sure of being able to trace accurately. 

Masterton (above: 1972, below: 2017) with the diagram map at the bottom. There are still a few details to be added of the station building etc. We are unsure of the uses of various buildings and sidings at this stage.



Thursday, 19 December 2019

Project Diary 2019-12-19: Greater Christchurch Maps Update

In the last few weeks our research has continued of Greater Christchurch maps, branching out into looking into railway housing in Heathcote and Lyttelton. The development of railway housing in large cities is naturally very different from small towns, as these two examples show. We plan also to take a closer look at railway housing in Addington, but not in any other part of Greater Christchurch except where it is within a station precinct.

The research has come to a pause for now due to the holiday season, but we intend to take a few weeks' break even when Archives reopens in the first week of January and probably catch up on some other areas of the maps project (i.e. some areas outside Greater Christchurch). There are only a few stations' worth of files to look through within the GC area, perhaps only at most two more months of research. The maps themselves haven't progressed much recently, but the break period will be used to get progress in that area as well.

Monday, 2 December 2019

Heathcote Pumping Station Siding & Ferrymead Railway Siding [2]

Following on from last month's post about the Heathcote Pumping Station siding, here is an updated map showing the Heathcote Expressway cycleway that is expected to be built along this corridor within the near future. It will cross over the Ferrymead Railway siding and then follow the Main South Line corridor to Truscotts Road.


Saturday, 16 November 2019

Project Diary 2019-11-15: Greater Christchurch Maps Key Milestone


We are pleased to announce a key milestone has been reached in the Greater Christchurch maps we are producing as part of the NZ Rail Maps project. We have now completed the historic aerial photo mosaic projects for all of Greater Christchurch, that is, the following four sections of railway:
  • Eastward: Main South Line from Christchurch to Lyttelton
  • Westward: Main South Line from Christchurch to Rolleston
  • Southward: Hornby Line from Hornby to Lincoln
  • Northward: Main North Line from Addington to Rangiora
This means the remaining steps needed to produce the actual maps for Greater Christchurch are:
  • Extract map tiles from the mosaic projects for GIS use 
  • Complete basic historical research for every station and siding in the Greater Christchurch area
  • Draw and label the maps for every location.
The extraction step is a slow one because of the use of multiple generations of historical aerial photography in the mosaic projects - the same reason why it has taken so long to produce those mosaics in the first place. In addition, once the resulting tiles have been imported into the GIS, it is common for mistakes to be detected at this stage, requiring more work to rectify.

The historical research stage is also slow because of the number of files that need to be consulted. At this stage we have been researching up to 50 files in a typical week over the past 3 months, which in total has been in actuality 500 files to date. We estimate it will take another 6 weeks of work to complete this but there may not be more than 200 actual files left to look at.

After obtaining the various diagrams that we have copied as part of the historical research, some of these will need to be imported into map mosaics where they are the only source of information for a particular historical feature. An example is the pumping station siding at 2.81 miles on the MSL that was the subject of a recent post. Since this did not appear on an aerial photo, the copied drawing was added into the existing aerial photo mosaic and another set of tiles (only 2 in this case) dated 1924 were produced for the GIS in order to be able to draw the maps that accompanied the blog post. There is likely to be more of this needed, so the mosaics will have to be added to with the diagrams that have been copied. However, unlike the aerial photos that have been used in the projects to date, most of these diagrams only cover small areas and therefore don't take very long to be added in. So that will not in actuality cause much additional delay, as most of the diagrams we have copied in actuality are just for labelling features that we can already see on aerial photos.

Then finally the maps get drawn and labelled. How much work is needed for each yard depends on how big the yard was. This in turn informs the complexity of the task. In the past we have gone to great lengths to document as much as possible historical changes visible on different generations of aerial photography. Our focus has changed with Retrolens because of being able to get the NZR yard and corridor surveys that are not available on our previous main source for the region, which was Canterbury Maps. This means we have changed focus into having really only one or two complete historical layers for a yard or section, which will be a yard survey if there was one, and a corridor survey if there was one that shows significant changes from the yard survey. There are a very small number of yards that have had two NZR surveys, and the corridor surveys are additional to these. In the case of a small number of yards there is no yard survey (Heathcote for example) and we are relying on other historical surveys that are available of the general area. For some stations these will be highway surveys if the yard was alongside State Highway 1 or another highway corridor.

Previously we would go to great lengths to try to document which parts of a yard in the modern era were based on historical features visible in the yard survey that might have been done 40 or 50 years ago. However as you can imagine this requires a lot of work, not the least because it is difficult to exactly align the historical aerial photos to modern ones, and because in the case of some yards (Lyttelton, Middleton and a few others that come to mind as examples) they have changed so much that there has been major track realignment. So right now the focus is on drawing every track in the historical layout as a "former" or "closed" track and then drawing the tracks again as "current" or "open" on the contemporary aerial background, and not bothering trying to work out which bits are common to both. Just that we will use the filtering capabilities built into the GIS to display the appropriate generation of track and structures etc with the aerial photo generation that is applicable.

As we have noted in previous posts the actual map drawing is the furtherest behind at the moment as we have focused most of our time in the last few months on the mosaics and research work. This has been changed this week with the completion of the mosaics and even though research is not completed, we are currently progressing as much map work as possible, with Lyttelton and Heathcote progressing well at present. There has just been a post about part of Heathcote and our next post will be about Lyttelton. However we still have to do historical research for Lyttelton so the maps posted in the next post will be necessarily limited until we can find out more historical information about the general layout of Lyttelton. On the other hand it is possible to push ahead with Heathcote to full completion because we have done most of the research on that yard although there is still a small amount, maybe one day's worth, to be carried out.

So expect to see a lot more posts about specific yards and locations in Greater Christchurch in the coming weeks. Once that is done, then the overall project work will shift back to the rest of NZ as detailed in other posts in the last few months with the total project schedule. We can then expect to see the volumes produced for all of the other maps for the whole country.

Saturday, 26 October 2019

Project DIary 2019-10-26: Christchurch Maps

It's been another busy week of gathering research information and a lot of work pulling out map tiles. As noted in previous posts, we spend a lot of time each week, currently around 6 hours, researching all the stations in the Greater Christchurch area. This will involve viewing around 50 files a week and copying mainly track diagrams from them in order to be able to label everything on the maps properly. We have spent most of the time actually just gathering the information and very little lately has been put into maps because the process of creating the historic mosaics and getting map tiles out of them is relatively time intensive. 

So at the moment things appear to progress slowly while the main focus is in these phases of gathering information and investing a lot of work into creating the historical map background images to show the various locations around the Greater Christchurch railway network. This week's research had a look at Linwood Station which was a passenger station on the MSL between Christchurch and Lyttelton. It was located between Linwood Loco Depot and the Wilsons Road crossing and it served exclusively suburban passenger traffic. Like the other suburban stations on the "Port Line", Linwood closed in the early 1970s when the commuter trains to Lyttelton ceased operating, and there is practically no trace of it to be found today. However, NZ Railways Corporation still owns the entire Linwood site that it occupied until the mid 2010s and which is now leased to a number of entities. 

We also took a look at the early history of Linwood Loco, but aren't specifically interested in the entire history of that site, and haven't yet examined all of the records relating specifically to Linwood Loco. We also took a look at Opawa Station, which was the next stop up the line from Linwood and was also passenger specific. Ashley is another small station near Rangiora on the Main North Line and it was between those two stations that a couple of minor realignments of the MNL took place in the 1960s and 1970s relating to the replacement of two bridges, one of which is a major structure crossing the Ashley River. Ashley Station closed in the early 1960s partly as a consequence of the construction of the Ashley Bridge deviation but a siding is still in place for the nearby Canterbury Timber Products factory although disused for some years. Addington Station and also the Way and Works "Plant Zone" and the Signals Depot have been researched and we are currently looking at the numerous private sidings around Addington, including the NZ International Exhibition of 1906 siding which was laid from Riccarton Station across Hagley Park, and the lengthy Fletchers Siding also known as "The Alley" which served many industries and ran from Addington to nearly Riccarton Road.

Map tile production this week has taken in Heathcote and Ferrymead, so that we now have full sets of tiles covering 1940, 1950, 1961, 1970, 1973, 1976, 1985, 1995, 2000, and we also have the Linz aerial coverage for the 2000s, 2015 and some additional Canterbury Maps coverage for updating parts of Heathcote and Ferrymead to 2019. Normally for a smaller station like Heathcote we wouldn't cover such a large number of generations, however the interest for the widest range of coverage is more geared to Ferrymead, which was in significant development from the mid 1960s to the mid 1980s. Now having these full sets of maps will enable work to go ahead particularly with a high priority for Ferrymead; given that we already recently got full map sets for Lyttelton but have done very little with them so far, our actual resources (time) for map drawing itself are a bit scarce at the moment.

A partially completed map of the Ferrymead Railway Moorhouse Village site in relation to the Main South Line in 2019.

The Ferrymead site in 1961, when it was still a dairy farm.

Friday, 18 October 2019

Project Diary 2019-10-18: Christchurch Maps

Progress on the maps this week has continued to focus on the Main North Line section of Greater Christchurch. This inches on towards completion with, we estimate, just a week more work to finish it. Quite a bit of work was needed just to add a 1955 aerial image showing the old route between Chaneys and Kaiapoi (deviated in 1958), and the similar but less lengthy realignment between Rangiora and Ashley (1961) is also going to be included. We also expect to show the first couple of km of the Eyreton Branch having found an image dated 1963, one year before the purported closure date. As of this moment, all of Belfast from 1950 to 1985 has been put in, and what is actually left is some of the imagery for Papanui, Styx, Kaiapoi, Eyreton Junction, Southbrook and Ashley. Flaxton isn't currently being mapped, but if I can find anything about it in Archives I may add it.

The extraction of the map tiles for any part of G.C. has proceeded quite slowly. The updates for Lyttelton have been extracted, paving the way to move on to Heathcote / Ferrymead. Once the maps themselves are completed then we can focus our full resources onto extraction. This is quite an involved process as it is not uncommon

Only one day of research has been possible this week, focusing mainly on Addington Station. So far we have avoided looking into Addington Workshops, planning to leave that for another time, but will try and find out if there is any coverage of Plant Zone.

In the wake of the local government elections with the result not showing much potential for the desirable level of change we sought, we are considering what level of campaigning to continue with. Christchurch Transport Blog has more details.

Saturday, 12 October 2019

Project Diary 2019-10-12: Christchurch Maps

Local government election results are in and the unfortunate conclusion is we will not see much that improves Public Transport over the next three years in Greater Christchurch. More about this in Christchurch Transport Blog in the next few days.

Meanwhile Greater Christchurch maps are the main focus this week again and in recognition of the time this is taking, a project development schedule post went out earlier this week allowing for several months more work for the rest of the year and possibly the earlier part of next year on completing the GC maps.

The work is continuing on the last section of the Greater Christchurch map tile mosaics which is the section from Riccarton to Ashley. The tile work has been pushed ahead in the last few days. The research is also going ahead quite well with 50 files a week being worked through from Archives New Zealand's local office. However major areas are still to be researched including the stations of Lyttelton, Heathcote, Woolston, Opawa, Linwood, Addington*, Papanui, Belfast, Kaiapoi, Flaxton, Rangiora, Ashley, Middleton, Sockburn, Islington, Templeton. (* Addington has partly been completed, we have not yet looked at either of the Workshops or Plant Zone however and will have to prioritise these). The research has to do a lot of catching up as we only decided to start researching Greater Christchurch stations towards the end of August.

The tiles for most of Lyttelton have now been extracted but a small change put into the mosaic means re-extracting a small number. In the coming week we can expect to see tiles extracted for Heathcote and Ferrymead.

Thursday, 3 October 2019

Project Diary 2019-10-03: Christchurch Maps

Well here's another update, and promises, promises, promises.... the last week has slowed things down a bit due to having to deal with other issues, but we are back up to speed now. Plus there have been more than a few issues with Gimp that caused crashes, meaning having to go back and redo stuff and try to find out what wouldn't crash.

The reason there are issues with Gimp and needing a lot of hardware resources (a PC with 32 GB of RAM and a 200 GB SSD swap partition to use for the tile cache), is our preference to use the highest resolution imagery we can. For base imagery that is a resolution of 0.075 metres per pixel (i.e. 7.5 centimetres) and everything snowballs from there. Take for example Lyttelton. We could just do the main railyard but have chosen to cover all the areas where tracks went to, and that means a canvas of 12 tiles wide and 4 tiles high. That translates into a size in pixels of 57600 by 28800, or 1.6 billion pixels total. The highest resolution imagery from Retrolens (usually around 1:4300 scale but occasionally 1:3400) fits in well with that base resolution. By the time we've added in a few eras of historical imagery (from 1940 to 2000 generally) then the result, in this case, is a file size of 21 GiB. It's only since Gimp 2.10 came out that it's been possible for it to handle files greater than 4 GiB in size, which is a real blessing because otherwise multiple files would be needed which would be very inefficient and time consuming. 

We started out some of these Gimp projects covering multiple stations but then as more layers were added (we use a rule of thumb that no project will have more than 100 layers) some of these projects grew too big and had to be split into multiple files. That happened in the case of Lyttelton, which used to have Heathcote along for the ride, which is what was happening earlier this week when everything kept crashing because the system or Gimp hit some sort of limit. Heathcote is a big area to cover because it takes in Ferrymead, so the result was a lot of area to cover and eventually the need to split the files, which we can now recognise because the current version of the Heathcote file is 30 GiB and that is the upper limit of file size we're prepared to work with, from experience. With a file that size it takes ages to load into Gimp, the system will easily use half the total tile cache just to bring it up with no edits, and it can take three hours to save (and Gimp can still crash partway through the save if the file is too big and lose everything). So you can see we are working with some real limits.

The resource issues for doing these highest quality images is the key issue that affects the kind of coverage we do of stations around the country. Christchurch is a particular exception that is going to be the highest quality for all of Greater Christchurch, across multiple generations, and backed up by research as well. That simply can't be justified across NZ, and only major yards will get done to that level. Most sites will be done with just the NZR survey, an example being Bluff that was recently draw up, it was done to high quality but only one generation of historical images. With corridor surveys we can cover the smaller stations as well, but if we can't get coverage of them when they were open, there won't be any. Before we dropped the Midland Line coverage to focus on the Greater Christchurch stuff, we had covered just about all the stations to Kotuku with corridor surveys plus the major stations and some research as well. The same will go through for the MNL and MSL eventually as far as we can get to.

Anyway back onto Greater Christchurch, we only have the MNL from Riccarton through to Ashley to complete. The tiles for the rest will start to get spat out as quickly as we can from here, because map drawing is way behind and really needs to be pushed along as quickly as possible now. So all that MSL stuff will be pushed out as map tiles and then be drawn alongside finishing that stretch of MNL as quickly as possible.

Tuesday, 24 September 2019

Project Diary 2019-09-24: Main South Line

The southern most section of the Main South Line, from Templeton to Burnham, for the Greater Christchurch maps, has been completed in a mosaic form, with eras of historical maps varying from the early 1940s through to the year 2000. We had only intended to go as far as Rolleston, but as Burnham is just south of there and did have its own railway siding into the army camp, it was decided there was no harm in including that stationb. Apart from Templeton, Rolleston and Burnham, this mosaic project also includes Weedons and Weedons Air Base Siding. The air base site was opened sometime in the 1940s and closed roughly 60 years later, but the last remaining storage hangar was only removed quite recently.

The current Linz aerial photos we have of Rolleston are too old to show the Port of Lyttelton inland port site details, and since Canterbury Maps have much more recent ones, we will endeavour to find some way we can use the more recent imagery.

Mosaics are mostly completed for the rest of the Main South Line but there is still a bit of work to be done on the Lyttelton-Heathcote section. The Hornby Industrial Line section to Lincoln has been mosaiced and we are currently doing research on this section from Archives New Zealand. What has still to be carried out is the overlaps between all of the different mosaic projects that are of continuous sections of the rail corridor. In general the MSL corridor is mapped as a continuous section from Heathcote to Islington, and the Hornby Industrial Line from Hornby (MSL junction) to Lincoln. For  practical purposes these continuous sections are divided into a number of different Gimp project files with small overlaps, usually a single column of Linz base tiles. This makes it possible to easily copy overlapping layers between Gimp projects so that the other layers in a project can be lined up with the overlaps; this means that when the tiles are all viewed together in Qgis, everything lines up nicely across all the different sections. In Qgis the tiles are grouped by station, so that the different eras of a station's aerial photos can be turned on or off as the base imagery for each section of the maps. 

The local government elections in Christchurch are now underway and we await the results with interest. We believe that greater Government intervention in Christchurch is required to reorganise the planning focus of the city to designate the key rail corridors for their importance to urban development to get a full public transport focus for commuter rail in the city. The new city council will need to focus more on working with other bodies cooperatively and drop the previous council's efforts to take over the public transport system which has been an unneeded distraction. Public transport should continue to be regionally organised with increased powers given to the regional council. The Government has been content to date to leave the business cases for commuter rail to be developed by the local authorities which is really just giving a nod to their fellow Labour Party members in those authorities rather than actually indicating a genuine intention to bring about the implementation of such a service.

Thursday, 12 September 2019

Project Diary 2019-09-12: Hornby Industrial Line

As we continue assembling maps for Christchurch Transport Blog use, currently we have shifted to the Hornby Industrial Line, which is historically the section of the former Southbridge Branch from Hornby to Lincoln. It was designated as such in July 1962 after the branch was closed beyond Lincoln. In December 1967, the section of the Hornby Industrial Line between Prebbleton and Lincoln was closed. Subsequently, the section from around 3 km to Prebbleton was closed, although most of the track is still in place as far as Springs Road, except for the section now crossed by the Christchurch Southern Motorway, SH76. The Prebbleton overbridge was demolished in 1997, and all of the corridor south of Springs Road has been built over. The section from south of SH76 to Springs Road has been reused for a rail trail alongside the mothballed track. 

From time to time the idea is floated that the line could be reopened to Lincoln and if this were to take place, the route beyond Prebbleton would have to be changed due to the reuse of the corridor, including new station sites.

The maps below show some of the sidings which can be traced in the 2015 aerial photography. We know that many more will be visible on the historical map mosaic tiles when they are finished.

Around 1 km, with a siding visible across the site of a demolished building.
Around  1.5 km, at least three sidings are still partly in place.
Quite a notable siding around 2 km.  These premises are currently occupied by Pengelly Transport and may possibly have been used by Toll Freight at one stage.
The lengthy Watties-Tegel siding at around 2.5 km. This was the last siding used on the line. With the closing of this siding, there is no traffic currently moving on the line.
United Empire Box Co Ltd (known today as UEB) seen above in 1973 with a siding. There is no obvious trace on the aerial photos of this siding today.
UEB in 2015.
Prebbleton yard seen in 2012.

Saturday, 7 September 2019

Project Diary 2019-09-07

As some will know, this week CHAT Club released their "MaRTI proposal", which suggests the Middleton rail yards could be turned into a housing development. A couple of posts about it have appeared on Christchurch Transport Blog, but the indepth analysis hasn't been done until the historical maps of Middleton are ready. As per usual this has taken longer than expected but right now they are about to be saved in their final form.

The Gimp project covering this part of the MSL takes in from Middleton to Sockburn in order to keep the project at a reasonable size but it still has nearly 80 layers and a file size of just over 30 GiB. As per usual we start with 1940 as the first era covered, then 1950 and 1961. These three eras in particular are pretty much what can be found to cover any part of the railway landscape in Christchurch, but they are not rail specific. They vary up to about 1:16,700 scale. What is rail specific for this particular part of the MSL rail corridor are the NZR station surveys, which are in particular for Middleton in 1967, Hornby in 1972, Middleton again in 1975 and Sockburn in 1980. The actual areas covered extend outside those named stations. Typically the station surveys have a scale of around 1:4300.

Then we have the MSL corridor survey starting at Lyttelton and heading to Ashburton in this case, and it dates from 1984. Scale for these corridor surveys is usually 1:5500. To finish off we have two more non-rail surveys which are again standardised over much of Christchurch, and they are from 1994, and the only colour one which is from 2000. These last two are at a scale of 1:50,000 and because they cover such a large area at that scale, they have to be trimmed down to covering only the base tiles that we actually use in order to avoid a lot of unnecessary pixels having to be saved in the file and blowing it up too big. To explain further, these are the only layers that cover the whole area of the project canvas in one single layer, and with a canvas that is only half filled, due to the shape of the base not being a nice and regular, we have to avoid covering areas of the canvas that aren't occupied by the base layers, because it just wastes file space unnecessarily and it can add up to a few extra GiB each time we save, which is a big deal.

Saturday, 31 August 2019

Project Diary 2019-08-31

In today's update, we can report we have finally completed the historical map mosaics for the section of the Main South Line from Woolston to Waltham, after splitting the Gimp project into two parts to deal with persistent crashes caused by project file size. The last section to be added this morning was the historical coverage of the section for the year 2000, which is the most recent aerial photography available from Retrolens.

The historical eras covered in these mosaics of the Main South line are 1940s, 1950s, 1960s, 1970s, 1980s, 1990s and 2000s, with Linz aerial photography available after 2000. NZR official station surveys cover from Opawa to Waltham in 1970, Woolston in 1974, and Woolston to Waltham in 1981. NZR corridor survey is available from 1984, but only for Waltham; for some reason, an entire run (B) is missing from this survey. The rest of the coverage is general for Christchurch and of a lower quality and only the NZR surveys in general will be able to fill in the historical data for the section.

To back up the map data, this week we also have commenced three half-days of research at Christchurch Archives at the rate of one half-day per week for the Christchurch Station, which includes Waltham. We are prepared to carry out the more intensive scale of research just for Christchurch, and do not intend to spend any significant amount of time on the other stations, each of which would have less than one half-day spent on them. In each half-day session we would typically expect to view and copy content from around 40 files, and the time scale of one half-day per week is governed by limits on the rate at which Archives can produce and issue the files for our research. The main purpose of this research is to obtain additional map information about the locations and track layouts of sidings and time limitations mean we are not able to take in general historical research of the areas concerned, even though much of the information about Christchurch in the 1980s and 1990s is very interesting, being an era we lived through and had extensive knowledge of from a personal perspective.

At the moment our focus is going more into producing all of the mosaics as quickly as possible for Greater Christchurch, and less into drawing actual maps, and that is why we are publishing project diary updates lately rather than map coverage of the areas. This is driven by the needs of Christchurch Transport Blog for map tiles for project work, being a higher priority than NZ Rail Maps at present. Once all of the Greater Christchurch map tiles have been completed, then NZ Rail Maps can go back into map development around the country according to its existing goals. This of course also means the original project schedule for NZ Rail Maps that we outlined for 2019 will not be kept. We estimate at the moment it may take for the rest of 2019 to be able to complete the Christchurch Transport Blog map tiles, and therefore will have to rearrange our goals. 

This will mean the overall schedule for completing the bulk of the NZ Rail Maps project work for all of New Zealand will be altered. Against that, having increased resources has improved our efficiency considerably this week and will speed up the mosaic production.

Tile extraction for Woolston to Waltham will start early next week, so expect to see some actual historical mappables displayed in the next update. Mosaic production is shifting to the Middleton to Hornby section of the Main South Line, the Lyttelton to Heathcote section of the Main South Line (including Ferrymead) and the Bryndwr to Ashley section of the Main North Line which as far as possible will be worked on more or less simultaneously, as is now easier to achieve with the resourcing improvements.

Thursday, 29 August 2019

Project Diary 2019-08-29

This week work is still continuing on the historical map tiles for Waltham, Linwood, Opawa and Woolston. We have gained some additional resources this week to enable us to speed up the tile production work, so we are also simultaneously working on tile production for Middleton to Hornby section of the Main South Line, and the Bryndwr to Ashley section of the Main North Line. So the production of these tiles should be able to be sped up noticeably, as part of the reason for it being slow is the inherent slowness Gimp has when working with very large mosaic projects. Some of these cover a canvas surface having a working area of 3.5 billion pixels (3,500,000,000) and around 100 layers in total. The Woolston-Waltham project is now completed and tile extraction will be commencing and could be completed tomorrow but will probably have to be deferred for a couple of days due to other commitments, and we have had numerous Gimp crashes, so it has been slowed down a lot from what we expected last week.

The issue with a city like Christchurch or any main centre is you are looking at an entire section of a corridor, rather than a number of individual stations along it. Because there are sidings and stuff all the way along that corridor that you want to document, and that is certainly the case for the Main South Line from Woolston to Islington in particular, and on the Hornby Industrial Line as far as Prebbleton. It is not quite the same on the Main North Line which has historically much less industrial development. So that dictates Gimp projects that cover large areas. We could split these into multiple smaller projects but then there is too much problems with overlapping at the edges of these projects because those edges all have to line up when the tiles are put together in Qgis, and the historical aerial photos boundaries don't neatly end on a tile boundary. So a smaller number of larger projects is definitely the way to go, but we have had a few instances of having to split some of them up when they got too large. For example Addington to Ashley started off as one project, but then Addington and Riccarton got combined into another project with Christchurch and it ended up too large to put the rest of the MNL suburban area into it, so Bryndwr to Ashley is what it has ended up as. Same with Lyttelton to Waltham originally being one project that now has Lyttelton and Heathcote in one file and Woolston to Waltham in another. And so on. 

The extra resources mean the time Gimp wastes on saving large projects, which can actually take several hours to complete, can be used to work on another project at the same time. So in fact today we really were working on three at the same time at one stage because the first one was being saved. After completing the progress on the second one, it too was saved, and while that was happening, we worked on the third. Another time saving measure is to use Cubic interpolation for unified transforms instead of LoHalo. My hunch is that Cubic is a lot faster than LoHalo and makes very little difference to the quality of practically any layer we throw at it.

Thursday, 22 August 2019

Project Diary 2019-08-22

Since last week's diary report we have continued working on the maps for the Christchurch area. Putting together all the aerial photos can take a while to complete but we now have complete historical aerial photo tiles for Christchurch, Addington and Riccarton, and have started working on ones for Waltham, Linwood, Opawa and Woolston. These ones should be ready in a couple of days. Then after that we still have, as far as Greater Christchurch goes, to look at Lyttelton, Heathcote, Middleton, Sockburn, Hornby, Islington, Weedons and Rolleston on the MSL; Prebbleton and Lincoln on the Hornby Line; and Bryndwr, Papanui, Styx, Belfast, Chaneys, Stewarts Gully, Kainga, Kaiapoi, Flaxton, Southbrook and Rangiora on the MNL, to complete all of the stuff for GC.

Research has shifted to the GC area as well. After a break from the Midland Line work is starting with Christchurch Station which will take about 3 weeks to complete with over 100 files to view. The plan is to look at every station within the GC area in order to be able to fully detail the maps being drawn of the area.

Tuesday, 13 August 2019

Project Diary 2019-08-12

This week we have switched back to the Christchurch area maps due to the impeding local government elections. We are currently working with several candidates and preparing material in order to assist some of their campaigns, in association with Christchurch Transport Blog.

Because of this the Midland Line work has temporarily halted, although research at the local branch of Archives New Zealand has continued. We estimate approximately two more days of research at Archives will be sufficient to complete the Midland Line maps, but are unsure exactly when these maps will actually be ready.

We are taking the time to complete more of the historical maps of Christchurch as well as some of the other stuff we are doing so I have pulled up a number of Gimp projects and revised them as necessary to keep them within reasonable file sizes. For the Main North Line it is now split into one project that covers Addington and Riccarton along with Christchurch (from MSL) and a second one covering from Bryndwr to Ashley, previously it was all one project from Addington to Ashley. 

For the Main South Line we have Lyttelton to Heathcote including Ferrymead in a project, then from Woolston to Waltham, then from Middleton to Hornby, and then from Islington to Rolleston. The reason Christchurch was put in with Addington going north to Riccarton was because we had Addington in two projects, one for the MNL and one for the MSL, which was an unwarranted duplication.The one we haven't started on really is Hornby to Lincoln, and it's likely we will take Hornby out of the MSL Gimp projects at this point and put it into the one for the Hornby Industrial Line.

It's timely to comment briefly about maps of local government boundaries. Linz Data Services does not have this type of map in the list of layers that can be downloaded through their site on Koordinates. However, Statistics New Zealand, another Government department, does have them through its Datafinder site, http://datafinder.stats.govt.nz also hosted on Koordinates. As a result we have taken the opportunity to download six layers together: Maori Constituency 2019, Constituency 2019, Community Board 2019, Regional Council 2019, Territorial Authority 2019 and Ward 2019. This information is needed in order to discover the boundaries of each of the wards for the Regional Council elections and in so doing, be able to assist certain candidates in the wards of the transport related issues in their constituency.

Saturday, 22 June 2019

Project Diary 2019-06-22A

A quick follow up to the previous post. The key question for many reading this blog is "Does the Christchurch Transport Blog project subtract from the NZ Rail Maps project time commitment"?

The simple and perhaps slightly regrettable answer to this question is "Yes". This is key to understanding the recent slowdown in progress on NZ Rail Maps, since creating a Christchurch specific Qgis project file for parts of Volumes 10 and 11 of the maps has been the key focus for CTB and that has taken all of the priority in the last month or so.

The historical content that is relevant to the NZ Rail Maps project will continue to be included in Volumes 10 and 11 of NZRM and it's not expected to become a separate volume at the moment. However the possibility of the Christchurch map data going into some other type of publication is quite likely as well. It is already being published in the CTB and being used in various contexts related to CTB.

At the same time I also hope to get some historical map data of the Christchurch central business district which so far has eluded me (it would seem the surveys in Canterbury Maps are not available on Retrolens, so I will have to see if I can source CM's data in some form). It may be I end up having to use some lower resolution stuff but my preference by a long way will be at least 0.3 metre pixel resolution or maybe 0.5 or even 0.75 which I have not found anything similar to that goes back to say the 1960s or 1980s and covers the CBD area. 

But at least I can draw upon the NZ Rail Maps mosaics for the historical rail corridor coverage and that is why the effort is going into that at the moment. So I just need a little more work to get what I need out of somewhere.

As we saw last week I posted on how to get NZ Rail Maps in general back on track, refocusing on Volumes 1-12 Basic level maps, and that has to be the most important thing for NZ Rail Maps right now outside Christchurch.

Visit Christchurch Transport Blog to see what is happening there - just give me a week to update it with the current focus and some important stuff that I want to put onto there to give a context to that project. So just keep an eye on it between now and the end of June as I get some posts into there to explain more about what the CTB project is about and where it is going.

Project Diary 2019-06-22

This week progress has been slow but there has been headway in completing a set of mosaics for Christchurch along the Main South Line corridor. Another activity is in importing the old Google Earth maps that I have maintained from the beginning of the NZ Rail Maps project, into the Google Maps site. Another option I am investigating for these maps is the Open Historical Map site, which I have just found. At any rate, there will soon be a web based option of some form for placing the online map data that I currently have in KML files on my computer. These maps are very useful for quickly finding a rail route and stations and I use them all the time when looking up the Google Maps satellite pictures for an area. They are not actively maintained as part of NZ Rail Maps and are not recommended as a primary source of data.

I now have a second blog, Christchurch Transport Blog, and much of the recent work around Christchurch is more properly addressed by this blog, with the maps which appear on it being produced by the Christchurch-specific sub-project of NZ Rail Maps. Hence, from here on in, Christchurch Transport Blog will be talking in more depth about the Christchurch specific aspects of transport, that will take in a range of transport subjects about Christchurch. However, this blog and the NZ Rail Maps project will continue to talk about the rail-specific historical maps that are being produced as part of Christchurch Transport Blog. The CTB project also has its own Facebook group associated with its more specific segment of transport activism.

Something which is also of concern and deserves a greater focus is level crossing safety. There was this week a serious level crossing accident resulting in fatalities at Pongakawa, which is a small settlement along the East Coast Main Trunk railway between Te Puke and Edgecumbe. The full information on this accident is not yet available but we have to question the ability of local government roading authorities to be able to understand how to design safe level crossings because there are around the country numerous crossings of this particular design which have been shown to be hazardous. In this case the crossing concerned is regarded as dangerous by the local community but there has not been action taken to address their concerns. There are questions over Kiwirail's assessment criteria for what constitutes a hazardous crossing, the maintenance of crossings in safe working order, roading design, and funding for improving dangerous crossings.

Christchurch Transport Blog is going to have a post or two in the near future about crossing safety because concerns exists about some of the crossings in Christchurch and whether there is any incentive for either Kiwirail or CCC to address these concerns.