Thursday, 16 March 2017

Otago Central Railway [11]: Alexandra-Clyde

At the moment I am focusing just on getting the main line aligned from the aerial photos and haven't drawn any more station layouts or milepegs in since Wedderburn Station and MP112 (Omakau). However soon enough the alignment work will be completed right through to Cromwell as I have just reached the outskirts of Clyde. Here are some images.

Bridge 85, also known as Manuherikia No.3 Bridge, is a formerly combined bridge just east of Alexandra. The railway track, of course, originally went down the middle of the bridge, which is one lane for road traffic. The rail trail has been diverted onto a new footway clipped onto the side of the bridge.

Alexandra railway station. Although the station building was still extant at the time of line closure, it is one that did not survive, being demolished. There are relatively few places on the line where a station building still there at the time of the line closing doesn't exist any more. We have Ranfurly, Hyde, Pukerangi, Hindon and Clyde (both sites) station buildings still in place for example. The Kokonga and Ida Valley buildings are elsewhere in Otago/South Canterbury and the Wedderburn, Ngapuna and part of Galloway are among those which have been returned to the site as part of the rail trail, all these having been removed with pre-1990 yard closures.

Here you can see where the Alexandra station platform still exists.


A building at the corner of Dunstan Road and Chicago St, Alexandra, carries this mural of the old station with a Vulcan railcar and a steam train, and a wagon being loaded.

A little known fact is that the track deviation for the new Clyde yard began at Youngs Lane, rather than where the new route curved away towards the post-1980 terminus at Sunderland Street. This allowed 500 metres of the old rail corridor to be turned into the new Highway 8. The Clyde yard eastern limits were at the same location with the sidings coming off the main there. There was never a permanent level crossing of Highway 8 by the railway, although a temporary connection was made at Sunderland St between the old line to Cromwell and the new railway alignment.

Sunday, 5 March 2017

Otago Central Railway [10]: Omakau

Well I have been very busy over the last week or two and haven't done any maps much.

Here anyway is an aerial shot of Omakau with the platform and goods shed clearly visible. As mentioned last time I am just whizzing along and marking in mileposts etc and not drawing yards at the moment but I will get back into the layouts later on. Omakau had quite a big layout with the engine shed and triangle and quite a lot of other sidings and stuff.

Tuesday, 21 February 2017

Otago Central Railway [9]: Wedderburn-Auripo

Here's some features of the line between Wedderburn and Auripo. I have rushed ahead with marking mileposts up to 102 M and features and have yet to draw layouts of Oturehua, Ida Valley and Auripo stations.


Bridge 65 (Wedderburn) and Bridge 66 (highway overbridge). There have been two bridges at the latter site. The present bridge dates from 1966 (according to the DOC notes).



In an earlier post I wrote at length about the highway realignment between the 88 and 90 milepegs. The old highway route had a level crossing of the railway just before it reached the route summit of 618 metres above sea level. The railway then crossed the 45th parallel for the first time.

At some time before the highway realignment took place, a second overbridge, No.66a, was added near the 89 mile peg. The date being uncertain. I previously stated this could have been 1950 but now I have the chainage charts I see the entry recorded for this date simply states the clearance under the bridge. Additional research would be needed to clarify the installation date. I also have no idea when the highway was realigned but I am guessing it could have been in the late 1950s or early 1960s. Prior to installing the overbridge the highway crossed on the level just north of the bridge site.



Bridge 66a as seen from track level and road level respectively. The first photo is by Gerald Hyland. As was common in an earlier era, the bridge was placed at a right angle to the tracks in order to make it as short as possible, creating an S bend in the road.


At 92 miles just north of Oturehua a ballast siding was located with an engine shed for a time.


This ballast siding between Oturehua and Ida Valley at 95 miles has been marked previously on maps by me.


At 102 miles this is believed to be one of four alignment changes on the line. The others being at Wingatui (junction curve), Prices Creek (bridge replacement), and Clyde (new station site). Dangerfield and Emerson mentions an unstable hillside near Auripo (101 M) where a small deviation was later required. When I travelled on the line in 1989 a subsidence at this point dating from the 1950s was mentioned in the commentary given by George Emerson. The chainage charts show at this location only a continuous right hand curve, not the R-L-R curvature of the later route. It would appear the hillside subsided at this point and the bypass track built to get around the collapsed embankment became the permanent route.