Saturday, 3 June 2017

Otago Central Railway [22B]: Some more streetview shots

The ballast pit at Chatto Creek was open until the 1960s.
There was also a ballast pit at Ida Valley for a number of years.

The two photos above are both taken at the same location just north ( NZR east) of Lauder where there were originally ballast sidings on both sides of the track.

Another ballast pit was this one on the left at Reef Road just east of Oturehua. This one according to the chainage charts had an engine shed so it must have been well used in the construction era.


Between Wedderburn and Oturehua the highway has been realigned twice. The original route used this level crossing to get over the railway and there was another crossing closer to Wedderburn as well. The first alignment change was when this crossing got replaced by the overbridge you can see in the distance. We can only guess that there must have been a visibility problem with the curve and cutting to be able to see trains approaching from the east. Some years later the entire highway was moved to the other side of the railway line eliminating the need for the overbridge as well as the second level crossing near the line summit entirely (see below).

The first level crossing of the highway at the location referred to above was here and its significance in railway terms is being the summit of the entire railway line between Wingatui and Cromwell, at 618 metres (just over 2000 feet in imperial terms). The rail trail people have put a marker here for the purpose. The other interesting factor in the area is the crossing of the 45 parallel which happens twice and is also marked alongside the track, the first of the crossings is at the end of the straight in the distance. The line curved around nearly 180 degrees between here and Oturehua so that it went back across the parallel about 6 km further on.

There has always been an overbridge at this site just west of Wedderburn since the railway was constructed. The abutments of the first single-lane and probably wooden bridge can be seen in the foreground with its modern concrete replacement dating from about the 1960s behind.

Another ballast pit site near the 79 mile peg between Ranfurly and Wedderburn.
Another small ballast pit site just south of Ranfurly.

My next post will compare some shots with some of the photo stops we had on our trips up the line when it was still open.

Otago Central Railway [22A]: Some street view shots


Wedderburn as seen in April 2016. On the right we can see the concrete edged passenger platform and on the left, a high level loading bank. As the goods shed can be seen in the distance, this neatly illustrates that the station buildings in their present location alongside the road are some distance from where they were placed when the railway was open.

Clyde with the freight shed to the left and the loading bank to the right, the 215 km peg is alongside the far end of this bank. The water tank on the end of the freight shed dates from NZR days and is a standard pattern for "modern" water tanks (vats) that were made out of steel panels that bolted together.


At the end of the rail trail this subway was installed as part of the rail trail recently to allow pedestrian and cyclist access under the highway due to the hazards of crossing above.


At Bridge 70, Manuherikia No.1, maintenance work was underway at the time.

 This location in the Poolburn Gorge at 102 miles or 164 km is believed to be a realignment that was necessary due to subsidence. The fence appears to go along the top of what was the old embankment and along with other evidence helps to support the idea that the track was pushed uphill here and the date is thought to be the 1950s.

Ranfurly still has many of its old railway buildings, this is probably a way and works depot then next to it are trolley sheds, then further on is the station building and goods shed. And further south there is the old engine shed and the turntable as well on private land alongside the track. When the trail was first opened Ranfurly still had most of its track in the yard and an old DJ locomotive was kept in the goods shed. In the intervening years the track has been reduced to a length along the platform and the DJ was moved to Middlemarch to be kept as spares for the Dunedin Railways fleet. 

Kokonga still has a loading bank and much of the track that ran to it is buried in the grass alongside the trail. Behind the photographer to the left was the site of the old engine depot dating from construction days and also a siding going down the hill to the ballast pit.

 The Capburn Creek bridge at Tiroiti is a little different from most other bridges as the guard rails have been left on the bridge. This is because when the trail originally opened it bypassed the bridge and trail users were directed onto the road that goes underneath for a good view of the bridge. This has been altered since to allow cyclists and pedestrians to cross the bridge but horse riders still need to detour underneath. The road underneath was the main highway for many years and crossed the railway again on the level in the middle of the Tiroiti yard.

Prices Creek Viaduct is another realignment, this one was opened in 1963 when the new bridge was built and the story is that the girder spans came from the closed Moutohora Branch in the North Island. The original rail route from the 1890s can be seen curving round below the hillside to the left. There are still remains of the original bridge at this site which was nowhere near as high as the present structure. Rumour has it also some stock wagons were derailed down the bank somewhere near this location and the ruins of them are still on the site today, having been burned in order to dispose of the sheep carcases easily.

Just north of Hyde was the old ballast pit that was opened when Tisdalls pit near Ngapuna closed in 1934 and closed a relatively short time later in 1952. I wasn't able to get aerial photos of it although there are some gradient diagrams in with the chainage charts. The siding went off to the right where the toilet is and down the hill into what is now a freight carrier's yard, this part was quite steep. It was effectively a switchback that reversed direction to go under the mainline via the bridge you can see in the background and then about 2 km further east where there are still gravel pits worked today.


The location of Hyde station where the trail goes around the station site as it was privately owned from the time of closing the line until just a year or two ago. We hope the rail trail people will keep the yard intact (unlike Ranfurly) as well as the station and wagons on display. The main line can be seen immediately to the right of the track and there is a points lever for the loop where the road curves slightly left. The railway wagon on the left is on a backshunt off one end of the loop and the trail actually crosses this backshunt to go around the yard, you can also see the home signal still in place and it has been quite well maintained. It will be good to see if the whole yard can be cleaned up as most of the track is buried in weeds, the station building is in very good condition overall, there is another signal at the far end and there are a number of wagons around the place.


Ngapuna is the first station after Middlemarch. The station building was removed in NZR days (the station closed in 1979 some 11 years before the line was closed), it has been found and relocated back since.

Tisdalls Ballast Pit between Ngapuna and Middlemarch. This was closed in 1934 having been opened when the line was under construction.

I will post some more Streetview shots later today.

Friday, 2 June 2017

Otago Central Railway [21A]: Article writing

Well I have been pretty busy putting stuff together but I have decided to write up to the limit of 5000 words for an article as there are going to be perhaps three articles covering the whole line that I am writing about.

So that means probably pushing the first article out to Alexandra and perhaps further back towards Omakau as it will be necessary to fill out the article and that means the mileposts have to be marked in all the way along there as well as the layout of the station at Alexandra.

So this long weekend is a great time to really push that along in a big way but we will have to see how things pan out with other things I have to get done, however that is the intention but the layout, if there is one, of Alexandra may be limited although I do have an aerial photo of the site which is dated at the same time as the Cromwell Gorge stuff so I certainly hope to be able to do a reasonable map of the yard within a short time frame.

The Streetview coverage of the rail trail is certainly interesting but we can't use the kilometre pegs locations from it because of copyright issues as I don't want my maps to be encumbered with any licensing complications, I want them to be completely free for reuse, and anyway it would take a lot of work to put in the marked km pegs of which there are literally hundreds. It is still good to be able to take a look at parts of the route that I wasn't able to get a look at before, but stuff that you can only see on Streetview images can't be copied into the maps.

UPDATE: I have now started pushing out the first part to 5000 words which will go back to Alexandra or thereabouts. In conjunction with this I have put in 8 more milepegs. The aim is to get the rest of this (including the article) finished tomorrow and then leave Monday free for other things.