Tuesday, 25 December 2018

Palmerston North Gisborne Line [3C]: Five Generations of Gisborne

Gisborne is the terminus of the Palmerston North Gisborne Line, a 390 km route from Palmerston North via Woodville, Napier and Wairoa. The route was originally planned as part of a railway from Auckland to Gisborne via Opotiki; the railway was completed from Auckland to Taneatua as the East Coast Main Trunk and from Gisborne to Moutohora as the Moutohora Branch with around 100 km of gap between them that was never built. 

Instead, the railway reached Gisborne from the south. The main line from Palmerston North to Napier appears to have started at Napier heading south, with the first section opened in 1874. The last part through the Manawatu Gorge was completed in 1891. The Palmerston North to Napier  section of railway is noted for some large viaducts that originally were all constructed of wood. From Napier heading north the route was built in several stages. The first part was actually constructed from Wairoa to a port at Waikokopu and opened in 1923. This was not actually intended to be part of the national network at that time, and the route of the main line was originally intended to go further inland. This resulted in a line west and north from Gisborne to Ngatapa being built and opened in 1915, and also a section of formation being constructed from Wairoa to Frasertown. 

Also in the early 1920s the first section of the route from Napier to Wairoa was opened from Napier to Eskdale. This was extended to Putorino in 1930, but was closed the following year because of major damage from the Hawkes Bay earthquake and the effects of the Great Depression. It was eventually re-opened in 1936. By that time it had been decided the inland route via Ngatapa would not be pursued further, the Ngatapa Branch having closed in 1931. From Putorino the line to Wairoa was finally completed in 1939, and with the existing section to Waikokopu incorporated there were now 333 kilometres of track open. The rest of the 57 km to Gisborne was pushed ahead as a matter of priority despite the onset of WW2 and a number of competing railway projects around NZ, and was completed in 1942. It was constructed through rugged and difficult country incorporating several very long tunnels and numerous bridges and large embankments.

Whilst the railway from Palmerston North to Napier has always been an important secondary main line in NZ, the section from Napier to Gisborne has never been of major importance in the volume of traffic carried and there have been struggles to keep it open due to poor economic and geological conditions in the Gisborne region. There have been a number of major landslides and other significant issues especially in the Waikokopu to Gisborne section in the 70 years that it was open for. The Waipaoa River just south of Gisborne has experienced record breaking floods on numerous occasions which has led to the bridge crossing it being extended in length twice and now being more than double its original length making it the longest railway bridge in the North Island. The major Cyclone Bola floods of 1988 washed out a section completely and whilst it was repaired, the original section of the bridge was badly scoured and was not restored to its original piling depths, resulting in operational restrictions. 

In the early 2000s the freight volume carried on the line seldom exceeded one or two trains per week. In 2012 there were major washouts in the Whareratas section of the railway (between Waikokopu and Gisborne) which caused the line to be closed back to Wairoa. This was subsequently completely closed north of Napier due to insufficient traffic volume. However the railway from Napier to Wairoa is currently being re-opened to carry logs from forests in the area to Napier port for export.

Gisborne in 1948. Prior to the completion of the main line from Napier there was the Moutohora Branch and earlier the Ngatapa Branch to service, so the Gisborne station and yard were long established by this time.
Gisborne in 1968. This image shows the most houses that there ever were at the station, and the smaller loading shelter is present at the west end of the yard.
Gisborne in 1977. Between the time of the previous aerial photo, Awapuni Road was pushed through the easternmost end of the railway yard. This meant the turntable and part of the engine shed had to be relocated or replaced.
Gisborne in 1986. In the post-deregulation era the yard looks emptier, and a number of houses have gone.
Gisborne in 2012. The goods shed has gone and a larger freight shelter replaces the small one at the west end of the yard. All the houses have gone, most of their site now occupied by the Captain Cook motor lodge. About half of the freight yard has also been removed. Since Kiwirail closed down the through line the only trains have been summertime vintage steam operations by Gisborne City Vintage Railway to Muriwai; GCVR having taken over the engine shed at the eastern end of the station. The line further east to the wharf has been disused for many years, but steam trains occasionally use it to meet cruise ships at Port of Gisborne.

Wednesday, 19 December 2018

East Coast Main Trunk [1B]: Rotorua Branch 2 (Rotorua Station 2) : Five Generations Of Rotorua

This will be the last posting about the ECMT for a while. I have no plans to map any other parts of the ECMT or its various branches for the present time (even though I did spend some time recently downloading coverage for some other ECMT parts).

Rotorua is a well known city in the Bay of Plenty based around Lake Rotorua and is the terminus of the mothballed Rotorua Branch. Like other parts of the ECMT it had various incarnations due to repurposing of different connecting sections as other lines opened or closed. The first part was privately built from Morrinsville to Tirau (a total of 78.5 km) and opened in 1886. It was taken over by the Government soon after and reached Putaruru in the same year. The section from Putaruru to Rotorua was opened in stages between 1893-1894. The total length of the route was then 111 km made up of Morrinsville-Waharoa (24.55 km), Waharoa-Putaruru (36.02 km) and Putaruru-Rotorua (c.50.50 km). The Rotorua route was one of several proposed to link the ECMT through to Gisborne, which was later considered for a linkup with what became the Taneatua Branch instead, but was never built. Extensions from Rotorua to Taupo were also considered, along with a freight connection to the Waipa State Mill just south of the city. Again, none of these ideas amounted to anything. The most recent idea has been from the New Zealand First political party which in 2014 suggested that Rotorua could be reached via a new line from Kinleith (one presumes this would bypass the notoriously steep Mamaku incline of the original route) which would continue on to Taupo.

Rotorua had passenger services via Auckland from the outset, originally the prestigious Rotorua Limited, which became the Rotorua Express. In 1959 this steam train was replaced by 88 seat twinset railcars, which only lasted until 1968 when the service ceased entirely. Passenger operations were resumed in 1991 with a Silver Fern railcar as the Geyserland Express, also from Auckland. This ceased when the line was shut down in 2001. 

From 1978 the section of the Rotorua Branch from Morrinsville-Waharoa became part of the ECMT main line as the original main line via Paeroa was reincorporated into the Thames Branch and the Kaimai Tunnel, accessed via Waharoa, opened. At the same time, the section frm Waharoa to Putaruru became part of the Kinleith Branch that had opened from Putaruru to Kinleith in the early 1950s. Consequently at that time the Rotorua line was reduced to the 50 km section from Putaruru to Rotorua. The line gradually wound down after the deregulation of long distance freight (which drastically reduced the traffic on the entire NZ national network) from 1982 to 2001 when the passenger services ceased, freight services having been withdrawn the previous year. Prior to that, in 1989, the central city Rotorua station was closed with the terminus being shifted 2 km nearer to Putaruru, at Koutu. In 1995 the passenger terminal at Koutu moved from the south side to the north side of Lake Road. In 2014 the Lake Road overbridge was demolished, cutting off access to the former freight terminal on the south side of the road.

The line is currently partly used by Rail Riders operating self propelled adapted golf buggies ("rail cruisers") for tourists from Mamaku. Some other parts of the line are impassible due to theft of track. Other tourism or heritage railway proposals such as the Second Chance Train Trust (1990s) and Geyserland Express Trust, later Rotorua Ngongotaha Rail Trust have collapsed. The latter group proposed the re-opening of the line for full freight and passenger operations but this never had a chance of getting off the ground. 

So the five generations of Rotorua begin in 1951 which is our first aerial image as seen below.

Note the freight yard was relatively small in this era but did have the goods shed (opposite the station) and the stockyard at the eastern end.. The station is the original straight building. The engine depot with turntable is visible at the west end of the yard. Housing is located all along the southern boundary but a lot of the station land has not been developed yet.

Next image is from 1966.
We can see very major differences in the 15 year interval between the taking of these aerials. Without doing additional research I can't narrow down the period when these works were carried out. However we can see that there was a major expansion of the freight yards, a new station building set closer to the road, which also had a bus terminal in front of it, and a road services depot building upper left. Some housing at the top right corner has been removed.

Next image is from 1972.
The only  obvious change in this instance is the removal of the stockyards at the eastern end of the line, as this was an era when stock carriage by rail was being phased out around the country. Formerly the Rotorua station had carried significant volumes of stock to the freezing works in Auckland.

Next image is 1983
At the western end of the yard there is a new single road diesel era engine shed (replacing the two road steam shed) and the turntable has been replaced at a site closer to Ranolf Street. Up at the eastern end next to Fenton Street the building next to the former stockyards (function unknown at this stage) has gone. Some track in the yard has been altered but otherwise it still looks much the same. A few of the houses have gone. However the station precinct did not have a long life from this point; it was closed down in 1989. This was an era when wholesale slashing and burning of the national railway system was being carried out, resulting in a great deal of valuable central city railway properties around NZ being cleared and sold for redevelopment. So the central city terminus was closed and the freight yard was relocated 2 km up the line to Koutu. The impact of this decision on the reinstated passenger service that began in 1991 has been hotly debated.

Finally we have the current aerial view of the site.
There is practically no continuity between the NZR era and the present day. That is one of the reasons for drawing maps like these, to help people visit on the ground and get a sense of what once was. There are just two buildings in the present day site that can be seen on the 1983 aerial photo. These are the L-shaped building (currently ASB Bank) at the corner of Amohau Street and Tutanekai Street (a smaller square version of this can be seen in some of the earlier aerials as well) and the McDonalds premises on the corner of Amohau Street and Fenton Street.