Friday, 16 June 2017

Otago Central Railway [31C]: Alexandra 3

While I am still working on maps for Alexandra here are some bits from Whites Aviation photos

This 1959 shot shows the west end of the station yard and it looks like there were some sidings at that end. The amount of documentation in publications like D&E of sidings is pretty small. 


Taken from the same original and further west out from Alexandra yard we see oil company sidings. 

A different image from 1959 but similar to the first one, probably taken at the same time, this one also shows a bit more of the yard including the goods shed.
Another shot of Alexandra taken in 1947 with a good clear view over the station and goods shed.

From the same 1947 photo this is the west end of the yard. There was no trace of the oil company sidings that we saw in the earlier photos. However there is a clear siding into premises facing onto Chicago Street and the under-construction building (foundations visible) that was the Apple and Pear Board premises now Hinton fruit and wine sales. Can't remember where I have seen the photo that showed Apple and Pear Board right now. It looks like next to that premises were stockyards as marked by the row of "deckers" as the wagons were called, having double decks to load stock. But there doesn't seem to have been a siding into the APB premises as there would not have been room unless it came off the siding into the other premises on Chicago St.

 This one's from 1951 as is the one below.
These ones show the oil company siding quite well and also that it was behind the main so there were sidings both sides of the main line and more than one line crossing Chicago St.

Not rail but this one shows what was the original highway bridge (as it later became) in Alexandra and was taken possibly in the 1930s. In the mid 1950s the present bridge was constructed alongside this bridge and the old bridge was demolished except for the piers that still stand in the Clutha River to this day and are designated a heritage landmark.



Clyde 1947 this is at the west end of the yard which is covered by this WA image (currently mislabelled Alexandra).

Wednesday, 14 June 2017

Otago Central Railway [30A]: Galloway

Galloway was a small country station in the midst of the Galloway flats. There seems to have been limited facilities provided at the station which had just a lean-to building provided with a goods section and a ladies waiting room (as it was originally titled). However it was sited on a platform, as we know many stations did not have platforms at all. In addition there was a loading bank and stockyards but there does not seem to have been a separate goods shed as far as I can discover. Only the station platform and building are shown as I have no information about the other facilities, the aerial photo I have is too poor a quality to really see anything at Galloway.

Galloway closed in 1978 and Keith Clare purchased the station building that same year. Only the ladies waiting room part was able to be saved and it was relocated to the Clares' nearby farm. In 2003 after the rail trail opened the building was sold back to the rail trail trust and moved onto a site just behind where it used to reside. The actual part of the building that is seen there today is less than half of the original building length, the map shows the discrepancy in size between the original and present buildings.


Overview of Galloway

The station platform, building and present location of the station today.

 This extract from the NZMS1 map shows that the road was originally diverted to allow more space for the station site. This is confirmed by the aerial photo that I have. The road appears to have since been straightened.

 Heading into Galloway from the east, this is Bridge no. 79 (Dip Creek)

 Bridge 79 (Dip Creek)

 200 km peg on the approach to Galloway. Only 15 km from the end of the line at Clyde.

 Galloway as it is today.

 Galloway today. Looking the other way.

 Near the Manorburn dam, this shows how the Little Valley hills close in on the railway for the last few km to Alexandra. This is Bridge No. 80 between 126-127 miles.

This is bridge 81 crossing the Manorburn. Water flowing from the dam into the Manuherikia River.

 The same bridge photographed from the back of an excursion train in 1989.

Crossing Tucker Hill Road just short of the 128 mile peg, only about 1.5 km from Alexandra.

About 300 metres east of the road-rail bridge. A 1989 excursion train.

Tuesday, 13 June 2017

Otago Central Railway [29A]: Chatto Creek

Chatto Creek was an interesting station because of the ballast pit at the eastern end, as otherwise there was little to distinguish it from a horde of other small country stations with similar (basic) facilities.

Geographically, Chatto Creek was at the foot of the Tiger Hill which got the line through some hills down the grade from Omakau. The engine depot was always at Omakau and no facilities of any sort were provided at Chatto Creek except for a water tank. The engine shed siding up near the ballast pit was only used during the construction era and there is no record of any turntable being associated with it. I didn't find any detail in D&E about how trains got over the grade from Chatto Creek to Omakau, for example whether double heading from Cromwell or Clyde up to Omakau was used, or whether trains were split at Chatto Creek to be taken to Omakau in two pieces. There were not a lot of sidings at Chatto Creek to store train wagons for this purpose.

 Overview.
 Details of the ballast pit which had two lives. It was used initially during the construction era and then closed. In the 1920s it was revived and used for a number of years and the plan for it is dated 1938. The exact closure date is unknown but D&E suggests approximately 1960 while noting it had been unused for many years. In the first era the points came off the mainline east of the bridge no.76, but when NZR reopened the pit they put a separate bridge no. 76a in for the siding, the beams of which are still in place today. This enabled the mainline points to be moved up into the station yard

 Some rail houses and railway structures, one of the houses is still in place today.

The size of the station building is not very clear on the plan. The yard didn't appear to have a goods shed or stockyards for all of its life. I have not seen a photo of Chatto Creek that contained a goods shed.


The single remaining railway house at Chatto Creek.

Bottom of Tiger Hill. The line takes a curve through more than 100 degrees which takes it up and out to the right in front of the hills as it climbs towards Omakau.

 Coming out of the curve at the bottom of Tiger Hill, the station is at left middle of this view in the distance.
 Coming into Chatto Creek along the straight at the eastern end.
 The ballast pit. Unlike most of the ballast sidings we have a detailed drawing in the chainage charts showing the depressed area that is clearly where the pit was.
 Looking eastward from the bridge (76) as the line sidles alongside a rise in the ground, ballast pit to the right.
 Similar view from a little further westward, showing the bridge 76.
 Looking the other way towards the main yard and again showing the bridge.

The beams on the left are where the water tank stood at the eastern end of the yard.
 On the left is the loading bank, on the right used to be the station platform and building.
 Looking back the other way with the house in the distance, the ballast pit behind the trees beyond the house.
 The road crossing at the western end of the yard.
 There was a siding out to the right accessing a stockpile of rails and sleepers. This might have been just during the construction era.
 As the line approaches the second crossing of the Manuherikia River the hills close in on the route.
Coming up to Manuherikia No.2 Bridge (Bridge 77) and showing the rocky foothills, the line passes alongside these foothills in the river valley before climbing out of the valley into the Galloway flats.

Otago Witness photo of the bridge under construction in 1905.

 Bridge 77

A train crossing the bridge the year before the line closed, this is the Photographers Special train of 16-9-89. Something I had not noticed before is a gangers shed visible at the far end of the bridge. This accounts for the cutting being wider at that end of the bridge, but the hut is not there today.

 However a bit further up the line there is a hut on the side of the trail. Nearing the 123 mile peg.

Bridge 78. This originally crossed a sludge channel but has now been taken over as a farm access. Sludge channels date from the times of gold sluicing which was extensive in Central Otago 100 years ago and has left a legacy of altered landscapes. The function of a sludge channel was to take the flow of waste water and tailings from the residue of sluicing.

The line is now crossing the Galloway Flats area approaching Galloway Station.